We produce and deliver environmentally friendly heat energy

Turnkey installation of thermal equipment

NO CLIENT`S CHARGES!

CLIENT'S
EXPENSES
0
 

SAVING ON
THERMAL
ENERGY

to 20%

CLIENT PAYS ONLY FOR HEAT!

 

Expenditures for installation/modernization of boiler equipment equal zero. Banisa Energy Ukraine realizes and supplies all what is needed at its own expense.

 

Diagnostics of a facility

is done with the aim of revealing energy efficiency reserves, defining activities on its raising, and possibilities of their implementation.

Diagnostic procedure refers to:

  • Gathering information
  • Analysis and system status evaluation of  heating supply, water supply, equipment stock of heating devices
  • Revealing of unjustified heat losses and determination of their amount
  • Status evaluation of the system of rationing power consumption and using energy carriers
  • Check-up of an enterprise (facility) energy balance
  • Preparation of a balance of thermal capacity of buildings for heating, ventilation, hot water supply and other heat consumers, plotting of thermal capacities depending on the external temperature
  • Efficiency check of planned innovation
  • Elaboration of energy saving methods
  • Drawing-up of the energy performance certificate
 
Designing

Designing of the boiler room foresees:

  • drawing-up of a personal project
  • calculation of necessary power of a boiler room or injector group
  • obtaining of all authorization documentation for further operation
 
Replacement of the out-of-date equipment. 
Putting into operation

The programme of the project implementation foresees replacement of the out-of-date equipment with the innovation equipment manufactured in accordance with European regulations and requirements. According to the testing results in European laboratories, the boiler equipment is certified and the conclusion about maximum efficiency with minimal discharge to the atmosphere and complete operational safety is received.

 
Service maintenance

Service activities for boiler-room maintenance include:

  • technical inspection, verification and adjustment of burner devices, automation equipment and pumps, operational tuning of the boiler equipment, boilers, and heat exchanging devices
  • verification of safety devices: safety valve, safety thermostat against overheating, etc.
  • replacement of fuel filter cartridges, spray jets, cleaning of sediment filters
  • verification of coolant pressure in the system, of sealing capacity of the joints, troubleshooting
  • complete audit of the boiler-room and its equipment within the framework of preparation for the heating season

 

 